Case Studies
LiteTrack Protects York Racecourse Crossing
York Racecourse used GroundGuards’ LiteTrack to create quick, low-cost protection for their 7 furlong crossing during wet race days.
Read moreFastCover Protects Warehouse Floor
See how FastCover protected concrete floors at a Warwick warehouse from damage caused by forklifts and plant equipment.
Read moreMaxiTrack Supports Crane at Headingley
MaxiTrack supported a 35-tonne crane during stadium seating works at Headingley, protecting the turf and enabling safe, efficient operations.
Read moreSafe Walkways for Sutton Road Cemetery
Southend Council used GroundGuards’ FastCover mats to improve graveside safety and access during wet conditions at Sutton Road Cemetery.
Read moreFastCover Keeps Housing Site Walkways Clean
FastCover mats created clean, defined walkways for a housing site, helping reduce mud transfer and improve safety across uneven ground.
Read moreMaxiTrack Parkland Diversion Road
See how MaxiTrack enabled a 150m temporary road across soft parkland, diverting traffic safely during a construction project on the south coast.
Read moreFastCoverPlus Walkway for Covid Test Site
GroundGuards supplied a FastCoverPlus walkway to ensure safe, socially distanced access at a busy West Yorkshire Covid-19 Test Centre on soft grass terrain.
Read moreEnviroMat Trackway Protects Pavers
EnviroMat protected fragile gravel-filled pavers from heavy lorry traffic during a landscaping project in Surrey.
Read moreXtremeMat Trackway for Sewage Works Access
XtremeMat enabled safe, stable access for a sewage works project near Doncaster, protecting sensitive ground between river and railway.
Read moreXtremeMat Haul Road Protects Isle of Iona for Scottish Water
XtremeMat created a damage-free haul road for Scottish Water’s Iona project, protecting a sensitive SSSI while ensuring safe material delivery
Read more